Packaged Sewage Treatment Plant Installation
To enable quick and simple site installation of your packaged wastewater treatment plant, plants are installed in sea containers (containerised). Battery limits of the containers are:
- Effluent inlet nozzle
- Power (unless power us supplied by a MAK Water generator included as part of a turn-key system)
- Treated waste discharge nozzle
- Sludge pump out connection
MAK Water offers hire of wastewater treatment plants with fully turn-key systems including generators, tanks and irrigation/distribution pump sets, which are fully maintained by MAK Water’s service team when installed on site.
Typically hire water and wastewater treatment plants are supplied for short term usage (up to 18 months) or where capital constraints apply. Longer terms can be accommodated through a Build Own Operate (“BOO”) or Build Own Operate and Transfer (“BOOT”) model.
Generally, MAK Water can supply a hire wastewater treatment plant within 2 weeks from receipt of firm commitment, depending on availability at the time of order:
Below is a list of hire wastewater treatment plants held in stock:
*Where additional water treatment capacity is required units can be added on a modular basis
View related Case Studies
Wastewater Treatment Solutions Australia-Wide
MAK Water can design, build and install package water treatment plants that are available for hire across Australia, as well as export internationally. If your business would like a quote about MAK Water’s packaged wastewater treatment plant, call today on 1300 669 032 or send an online enquiry.
Applications
Real-world examples
What people are saying
Hire